Water, Energy & Animal Welfare
Site ProgressSewage treatment plant
300 KLD, zero liquid discharge
Each image is labelled Current Activity, Site Progress, Proposed Design or Reference Image.
How it is verified
- Milestone check before each payment
- Separate CSR account and reconciliation
- Utilisation and CA certificates
- Quarterly partner reports
Why this amount
₹5.77 Cr
Anaerobic and facultative treatment with a 9 to 10 day retention period. Treated water goes to irrigation, flushing and cleaning, and is not used for drinking or cooking.
| Cost line | Basis | Amount |
|---|---|---|
| Treatment package (SWEM Water) | Sourced | ₹45.00 L |
| Civil works, storage, six pumps, 700 m of piping | Sourced | ₹430.00 L |
| Project management, monitoring and reporting (3%) | Planning | ₹14.25 L |
| GST provision and rounding | Planning | ₹87.75 L |
| Indicative total | ₹5.77 Cr | |
Sourced: cost schedule or vendor quote. Planning: estimate pending final quotation. Forecast: calculated at published rates. Totals may differ slightly because of rounding.
- Schedule VII
- (i), (iv)
- UN SDGs
- 6, 7, 11, 12, 15
- Trackable impact
- Reporting support
- Audit readiness
Related
More in this programme

Proposed DesignCapital
Rainwater harvesting and recharge
Five recharge structures, 12+ lakh litres a year
₹43.00 LDetails

Proposed DesignCapital
Native landscaping
10,484 sq ft irrigated by recycled water
₹67.00 LDetails

Proposed DesignCapital + programme
Cattle shelter and three-year care
20 cattle; capital only ₹54.24 L
₹72.62 LDetails