Sewage treatment plant

300 KLD, zero liquid discharge

Site Progress

Each image is labelled Current Activity, Site Progress, Proposed Design or Reference Image.

How it is verified

  • Milestone check before each payment
  • Separate CSR account and reconciliation
  • Utilisation and CA certificates
  • Quarterly partner reports
Why this amount

₹5.77 Cr

Anaerobic and facultative treatment with a 9 to 10 day retention period. Treated water goes to irrigation, flushing and cleaning, and is not used for drinking or cooking.

Cost breakdown
Cost lineBasisAmount
Treatment package (SWEM Water)Sourced₹45.00 L
Civil works, storage, six pumps, 700 m of pipingSourced₹430.00 L
Project management, monitoring and reporting (3%)Planning₹14.25 L
GST provision and roundingPlanning₹87.75 L
Indicative total₹5.77 Cr

Sourced: cost schedule or vendor quote. Planning: estimate pending final quotation. Forecast: calculated at published rates. Totals may differ slightly because of rounding.

Schedule VII
(i), (iv)
UN SDGs
6, 7, 11, 12, 15
  • Trackable impact
  • Reporting support
  • Audit readiness

Enquire about this project

Schedule a CSR Project Visit

Visit the campus, meet our team and review project progress.

Partner With Us