Community Nutrition
Proposed DesignTwo community kitchens
Build and heavy-duty equipment
Each image is labelled Current Activity, Site Progress, Proposed Design or Reference Image.
How it is verified
- Quantity-surveyor cost schedule
- Vendor quotations
- Site engineer’s certificates
Why this amount
₹4.28 Cr
Two kitchen blocks of 3,755 sq ft, with two 800-litre cauldrons, an electric boiler, a roti machine, steamers and induction lines. Induction and steam avoid open flames at the cooking point.
| Cost line | Basis | Amount |
|---|---|---|
| Construction and fit-out, 3,755 sq ft | Sourced | ₹105.73 L |
| Cooking and kitchen equipment | Sourced | ₹257.33 L |
| GST provision at 18% | Planning | ₹65.35 L |
| Indicative total | ₹4.28 Cr | |
Sourced: cost schedule or vendor quote. Planning: estimate pending final quotation. Forecast: calculated at published rates. Totals may differ slightly because of rounding.